Chapter 6 Situation concerning the Accident
Situation and outline of the accident; Efforts for decommissioning and other situations concerning the accident at TEPCO's Fukushima Daiichi NPS
6.1 Fukushima Daiichi Nuclear Power Station (NPS) Accident Section Download Slides Download
- Damage due to the Great East Japan Earthquake
- Accident at the Nuclear Power Station
- Factors of the Accident: (Estimated) Influence of the Earthquake and Tsunami
- Factors of the Accident: (Estimated) Status within the Reactor
6.2 Outline of the Accident Section Download Slides Download
- Responses Immediately after the Accident
- Ambient Dose Rates during Two Months after the Accident
(Within and around of the premises of the Tokyo Electric Power Company (TEPCO)'s Fukushima Daiichi Nuclear Power Station (NPS)) - Ambient Dose Rates during Two Weeks after the Accident
(Within and around of the premises of the Tokyo Electric Power Company (TEPCO)'s Fukushima Daiichi Nuclear Power Station (NPS)) - International Nuclear Event Scale (INES)
6.3 Efforts for Decommissioning and Progress Section Download Slides Download
- Procedures for Decommissioning and Contaminated Water Management at Tokyo Electric Power Company (TEPCO)'s Fukushima Daiichi NPS
- Reduction of Radiation Doses in Surrounding Environment
- Measures against Recriticality and Future Earthquakes and Tsunamis
- Improvement of Working Environment at the Fukushima Daiichi NPS
- Measures against Contaminated Water
- Decommissioning Measures