環境省_環境技術実証事業
List of links   Site Map   Contact us   Japanese

Verified technology introduction examples 4

Shuken Consultant Co., Ltd.
Verification technology Geothermal Heat Pump Air Conditioning System at Shuken Consultant Head Office
Target technical field:   Heat island countermeasures
         (Heat pump air conditioning system using geothermal heat, sewage, etc.)

Verification number:     052-1002 [PDF] Summary versio 0.3MB [PDF] Detailed version 2.0MB
Installed place: Introduction time: Chuo City Tatomi Welfare Center: March 2013
Company website: http://e-shuuken.jp
Introduction of case studies:  [PDF / A4 size]3.2MB
Figaro Engineering Inc.
Verification technology FTVR-01 Personal TVOC monitor
Target technical field:   Simple measurement such as VOC
Verification number:     100-1203 [PDF] Summary versio 0.4MB [PDF] Detailed version 1.1MB
Installed place: Introduction time: Tanita Co., Ltd .: September 2015
Company website: http://www.figaro.co.jp
Introduction of case studies:  [PDF / A4 size]1.7MB
[About this page] The contents of the episodes and the technical outline of the ETV are to be introduced at the responsibility of the operator, and the Ministry of the Environment and the verification organization do not take any responsibility for the contents.
▲ TOP
MOE > Environmental Policy > ETV > Download documents(Introduction examples/Verified technology introduction examples 4)